The short answer
Use HSE's five steps: identify the hazards, assess who could be harmed and how, put controls in place, record your findings, and review them. For a pub gig the hazards that matter are electrics, trailing cables, the stage area, crowding near exits, noise, fire and the load-in. If you employ five or more people you must record the significant findings in writing; with fewer, it is still the best evidence that you took reasonable care.
Key takeaways
- HSE's process has five steps: identify hazards, assess risks, control risks, record findings, review controls.
- Employers with five or more employees must record their significant findings.
- The law does not require PAT testing; it requires electrical equipment to be maintained to prevent danger. Visual checks before each gig catch most problems.
- HSE treats a 30mA RCD as secondary protection, worth using for band equipment but never a substitute for sound kit.
- Noise exposure for staff is covered by the Control of Noise at Work Regulations 2005, with action values at 80 and 85 dB(A).
- A separate fire risk assessment is a legal requirement for non-domestic premises, and a gig can change the answers.
A risk assessment for a gig night follows the same five steps HSE sets out for any workplace: identify the hazards, assess who could be harmed and how badly, put controls in place, record your findings and review them. In a pub, the hazards that cause real injuries on gig nights are trailing cables, damaged electrics, a crowded floor near exits, the band's load-in and loud volume for staff. One well-written assessment can cover all your regular gig nights.
Do I need a risk assessment for live music?
As an employer, you already have a legal duty to assess risks to staff and to anyone else affected by your business, including customers and performers. A gig changes those risks, so it belongs in your assessment.
HSE is clear on the paperwork. If you employ five or more people, you must record the significant findings. With fewer than five you do not have to write it down. Most licensees write it down anyway because it takes an hour and is the first thing an insurer, an environmental health officer or a court asks for.
Fire is separate. In England and Wales, the responsible person for non-domestic premises must carry out a fire risk assessment under the Regulatory Reform (Fire Safety) Order 2005 and review it regularly. Scotland and Northern Ireland have their own fire safety rules. Check that your fire assessment reflects the room as it is laid out on a gig night.
What are HSE's five steps for a gig night?
- Identify the hazards. Walk the room with the stage set up. Look at power, cables, the stage edge, exits, the toilets route and the outside.
- Decide who might be harmed and how. Customers, staff, the band, the sound engineer, smokers outside, neighbours.
- Evaluate the risk and decide on controls. Remove the hazard if you can, then reduce it.
- Record your findings. A one-page table is enough for most pubs.
- Review. After the first few gigs and whenever something changes.
What hazards should a pub gig risk assessment cover?
Electrics
Bands bring amps, a PA, pedals, lights and a tangle of extension leads, and they plug them into whatever sockets are nearest the stage.
- The law does not require PAT testing. HSE says it requires an employer to ensure electrical equipment is maintained to prevent danger. Your own house equipment should be on a maintenance schedule.
- For performers' kit, ask the act to do a visual check before plugging in: damaged cables, cracked plugs, taped repairs and scorch marks. HSE advises never using insulating tape as a repair.
- Use RCD protection for stage power. HSE recommends a trip rating of no more than 30mA, preferably at the main switchboard, or a plug-in RCD where that is not possible. Press the test button before use. HSE treats an RCD as secondary protection, so it does not replace safe kit.
- Do not daisy-chain extension leads or overload a single socket.
- Keep drinks off amps and away from the stage power.
- For outdoor stages and generators, use a competent person. HSE points to BS 7909 as the code of practice for temporary electrical systems for entertainment.
Our guide to PAT testing for musicians covers this from the band's side.
Cables and trip hazards
- Run cables along walls and away from walkways.
- Tape down or use cable covers where cables must cross a route people walk.
- Keep the fire exit route and the path to the toilets completely clear.
- Light the stage edge and any step up.
Stage and band area
- Mark a clear performance area so customers are not standing among the kit.
- Check any raised stage is stable and has no gaps at the edge.
- Secure speaker stands and lighting stands so they cannot be knocked over. Keep them away from the crowd.
- Avoid placing the band in front of the fire exit. It is a common layout mistake in small pubs.
Crowd and capacity
- Know your safe capacity from your fire risk assessment and stick to it on busy nights.
- Watch where the crowd builds. It is usually in front of the band and at the bar, often in the same corner.
- Brief door staff, if you use them, on capacity and the exits.
- If a gig night could take you past 200 people, note that Martyn's Law is expected to apply from spring 2027.
Noise
The Control of Noise at Work Regulations 2005 have applied to music and entertainment workplaces since 6 April 2008. The lower exposure action values are 80 dB(A) daily or weekly exposure, or a 135 dB(C) peak. The upper action values are 85 dB(A), or a 137 dB(C) peak. Staff working the bar near a loud band can reach these.
- Keep the bar and glass collection away from the speakers where possible.
- Offer hearing protection to staff on loud nights, and require it at the upper action value.
- Agree a house volume with acts.
Noise affecting neighbours is a separate legal issue, covered in our guide to live music and noise complaints.
Load-in and load-out
- Agree a load-in time when the bar is quiet.
- Keep a route clear from the van to the stage.
- Watch for heavy lifting on stairs and at the cellar hatch.
- Load-out happens late, when people are tired. Keep the route lit.
Example: a gig night risk assessment table
Copy and adapt this for your venue.
| Hazard | Who could be harmed | Existing controls | Further action | Owner | Done |
|---|---|---|---|---|---|
| Damaged band equipment or leads | Band, staff, customers | Act checks kit visually before use | Plug-in 30mA RCD for stage power, test button pressed before soundcheck | Duty manager | |
| Trailing cables across walkways | Customers, staff | Cables run along the wall | Cable cover where the lead crosses to the PA | Band and duty manager | |
| Overloaded sockets | Everyone | Two dedicated stage sockets | No daisy-chained extension leads | Duty manager | |
| Band set up in front of fire exit | Everyone | Stage area marked away from exit | Check before doors open | Duty manager | |
| Crowding at the front and bar | Customers | Known capacity from fire risk assessment | Count on busy nights | Door or duty manager | |
| Drinks spilled on stage equipment | Band | No drinks on amps | Shelf or table for band drinks | Band | |
| Staff noise exposure | Bar staff | Bar away from speakers | Earplugs available behind the bar | Licensee | |
| Speaker stand knocked over | Customers | Stands at back of stage area | Stands weighted or secured | Band | |
| Load-in on stairs | Band, staff | Load-in before 6pm | Clear route, door propped only during load-in | Duty manager | |
| Smokers and drinkers outside after the gig | Customers, neighbours | Signs asking for quiet | Staff check at the end of each set | Duty manager |
Review date: ______. Reviewed by: ______.
What should you ask the act for?
- Their stage size, power needs and any special kit. A technical rider puts this on one page.
- Proof of public liability insurance. Many venues make it a condition of booking.
- Confirmation that their kit is in good condition, with PAT records if that is your house rule.
- Their load-in and soundcheck times.
When you book through Gigtown, the booking request and reply give you a clear point to ask for these before the booking is confirmed by both sides.
How often should you review it?
Review after the first two or three gigs, then at least once a year. Review straight away if you change the stage position, start using an outdoor area, book a much louder or larger act, or have an incident or near miss. Keep the old versions; they show the history of what you improved.
Frequently asked questions
Do I need a new risk assessment for every gig?
No. Write one assessment for your standard gig night and review it when something changes: a bigger act, an outdoor stage, a new room layout or a much larger crowd.
Should I ask bands for their own risk assessment?
For larger or touring acts, yes. For pub bands, it is usually enough to ask for their public liability insurance and confirm their kit is in good condition, then cover the gig in your own assessment.
Do bands need PAT certificates to play my pub?
There is no legal requirement for PAT, though many venues ask for it as a house rule. What matters legally is that the equipment is maintained and safe, so a visual check before use is sensible either way.
Who is responsible for safety at a pub gig?
The venue operator controls the premises and has the main duty for customers and staff. Performers are responsible for their own equipment and for working safely.
Sources
- HSE: Steps needed to manage risk (checked November 2026)
- HSE: Portable appliance testing FAQs (checked November 2026)
- HSE: Electrical safety at places of entertainment, GS50 (checked November 2026)
- HSE: Event safety, electrical safety (checked November 2026)
- HSE: Noise at work regulations (checked November 2026)
- GOV.UK: Fire safety in the workplace (checked November 2026)
Sources checked 18 November 2026. This guide is general information, not legal, tax or financial advice.